What does it cost to start a t-shirt brand? A realistic line-by-line budget
The most frequent question from new brand owners is: how much do I need? The honest answer is that it depends on decisions you make rather than on a fixed market figure. But the budget can be broken into clear lines, separating what is paid once from what recurs on every order, and that alone makes planning possible.
Lines paid once
- Logo and identity design: varies widely depending on who designs it.
- Trademark registration in your market: not required to manufacture, but required to protect your name, and some platforms ask for it.
- Embroidery digitising or print screens: paid once and kept for reorders.
- Samples and their air freight: several rounds, often deducted from the order.
- Product photography: the line everyone forgets, and it is essential for selling online.
Lines that recur on every order
- The factory unit price, the largest line.
- Printing or embroidery per piece.
- Labels and packaging.
- Freight and insurance.
- Duty and clearance.
- Pre-shipment inspection fees.
The line that decides everything: the minimum
The usual minimum is 100 to 300 pieces per model and colour. That is not the factory being difficult but a consequence of cost structure: the dye cycle, cutting and line setup carry fixed costs that do not fall however small the quantity. If you want five models in three colours each, you face fifteen combinations, each with its own minimum. This is the mistake that drains new brands: variety before demand is proven.
How to start with the least capital
- Start with one model and one or two colours. Test demand before widening.
- Use a printed label instead of woven on the first order, and upgrade on the second.
- Start with four sizes, not seven.
- Choose a stock-available fabric rather than a colour needing a dedicated dye lot.
- Keep print colours to one or two.
- Do not reduce fabric weight. This is the one line you must not economise on, because it is the first thing the customer touches.
The hidden line: the cost of money and time
The deposit is paid two months before the goods arrive. That is tied-up capital with a real cost, and many do not count it. Add that the goods do not all sell immediately: estimate your stock turn, because the money stays locked in fabric until it sells.
Work out your retail price backwards
Do not start from the factory price and add a margin. Start from the price your market bears against competitors, subtract your required margin plus selling, marketing and returns costs, and what remains is the maximum unit cost you can carry. If it is below what the factory quotes, the problem is the specification or the quantity, not the factory.
Frequently asked questions
Can I start with fifty pieces? Possible with digital printing onto blank tees, but you are not building a brand with its own specification, and the unit cost rises steeply.
When should I move to larger quantities? When you have proven the model sells and know your real size distribution from data rather than instinct.
What is the biggest financial mistake? Spending the budget on variety in a first order instead of concentrating it in one good product.
We help you build a first order at the lowest possible capital while keeping a specification that can be repeated on later orders.
More articles































